Ghana In Big Trouble As Bonsa Headworks Which Produces Portable Water Is Shutdown Due To Galamsey

The Bonsa Headworks, a body that produces portable water in Ghana has been reportedly shut down, Gh Page can proclaim.

The news was made known in a communique shared by the body that Gh Page has sighted.

The body claims at this juncture, they have no option, but to ensure a shutdown.

They noted in the communique that, they are shutting down because of Galamsey, which they are finding extremely difficult to stop.

According to them, “We are sorry to announce that Bonsa Headworks that produced 75 % of portable water to Tarkwa Township and some environ have been shut down due to massive Galamsey”.

They claim the massive Galamsey makes it difficult for them to abstract the water for treatment.

The communique concludes that “the river is still being monitored for acceptable parameters to enable us to restart production, and until then, the plant remains closed”.

 - GhPage
Join our WhatsApp Channel

TODAY

Wednesday, January 22, 2025
29.2 C
Accra

Also Read

VIDEO: Husband chops his 19-year-old wife into pieces to sell her body parts

Sad! 23-year-old GH guy stabbed to death in Canada
Man 3

Popular Now

Ibrahim Mahama Offers To Pay Kofi Adoma’s Hospital Bills After Being Shot In The Eye

He Did Not Love And Respect His Mother- Lady Blasts Osanju